Tag Archive for: solarproject

Hydrogen could be produced for as little as AUD 2.85/kg, supporting Frontier Energy’s plans to make green hydrogen from a 500 MW solar project

Frontier Energy said that results from a pre-feasibility study (PFS) into its proposed Bristol Springs Solar project in Western Australia show that it has the potential to be an early mover, low-cost green hydrogen producer.

The PFS, conducted by Perth-based Xodus Group, is based on the development of a large-scale green hydrogen production facility at Bristol Springs, with power sourced from the company’s planned first stage 114 MWdc solar farm. The solar would power a 36.6 MW alkaline electrolyzer, producing an estimated 4.4 million kilograms of green hydrogen per year.

Click here to read the full article
Source: PV Magazine

If you have any questions or thoughts about the topic, feel free to contact us here or leave a comment below.

The proposed solar PV project will be integrated with 150 MW of battery storage capacity. The complex is due to be fully commissioned in 2024.

Renewable energy giant EDP Renovaveis SA (ELI:EDPR) today said it has clinched a deal to sell the output of a 200-MW solar park it plans to build in the US state of California.

The company, which is the renewables arm of Portuguese utility EDP (ELI:EDP), will sell the electricity under a long-term power purchase agreement (PPA). The name of the power off-taker was not disclosed in the press statement.

The proposed solar photovoltaic (PV) project, the name of which was not specified, will be integrated with 150 MW of battery storage capacity. The complex is due to be fully commissioned in 2024.

Click here to read the full article
Source: Renewables Now

If you have any questions or thoughts about the topic, feel free to contact us here or leave a comment below.

The BLM is moving forward with renewable development, including issuing final construction approval for the Oberon solar project.

The Bureau of Land Management is moving forward with renewable development in the desert this month, including issuing final construction approval for the Oberon solar project on about 2,600 acres near Interstate 10 in eastern Riverside County, and greenlighting a major transmission line from western Arizona to Blythe, California to help carry more power.

Both actions are part of a push by the Biden Administration to significantly ramp up renewables development in the southwest.

The BLM Palm Springs office on July 13 announced it had authorized a subsidiary of Intersect Power to build the 500 megawatt Oberon renewable energy project, enough to power approximately 146,000 homes and 200 megawatts of battery storage.

Click here to read the full article
Source: Desert Sun

If you have any questions or thoughts about the topic, feel free to contact us here or leave a comment below.

55,000 new solar power panels installed on 24 hectares in the territory of Vienna’s airport. Annual production is estimated at 30 GWh.

Austria’s capital city intends to reach climate neutrality by 2040 or ten years before the European Union as a whole. Transportation infrastructure is one of the most challenging segments of the economy, as such ambitious goals imply a swift transition to alternative energy technologies. The Vienna International Airport is spearheading decarbonization solutions on the local level.

Flughafen Wien Group claims it would eliminate its net emissions of carbon dioxide, in which the new solar power plant, the biggest one in the country, has a major role. The company, which also operates airports in Košice in Slovakia and in Malta, said the facility in Schwechat started producing electricity.

Click here to read the full article
Source: Balkan Green Energy News

If you have any questions or thoughts about the topic, feel free to contact us here or leave a comment below.

NJR Clean Energy Ventures (CEV) has started construction on an 8.9-MW floating solar installation in Millburn, New Jersey, that will be the largest floating array in the United States.

Using a floating racking system, 16,510 solar panels will be installed on a reservoir located at the New Jersey American Water Canoe Brook Water Treatment Plant. The clean power generated by the array will provide approximately 95% of the facility’s annual power needs through a power purchase agreement with CEV.

“Floating solar technology creates new opportunities for bodies of water to be a home for large-scale renewable energy generation and bring the benefits of clean energy to even more customers,” said Steve Westhoven, president and CEO of New Jersey Resources. “As a leader in New Jersey’s solar marketplace, we look forward to working with New Jersey American Water to support their power needs and advance the state’s clean energy and climate goals.”

Click here to read the full article
Source: Solar Power World

If you have any questions or thoughts about the topic, feel free to contact us here or leave a comment below.