ptp-080724-4

Transported 900 metres along the Seine, a 78 kW temporary photovoltaic power plant has docked at the Athletes’ Village

Transported 900 metres along the Seine, a 78 kW temporary photovoltaic power plant has docked at the Athletes’ Village

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *