ptp-080322-1

The proposed solar PV project will be integrated with 150 MW of battery storage capacity. The complex is due to be fully commissioned in 2024.

The proposed solar PV project will be integrated with 150 MW of battery storage capacity. The complex is due to be fully commissioned in 2024.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *