EDF Renewables’ 620-MW California solar portfolio is completed

EDF Renewables' Palen Solar site is fully operational consisting of 4 projects totaling 620 MWDC of solar and 200 MWh of energy storage.

EDF Renewables North America‘s Palen Solar site is fully operational and delivering decarbonized energy to the grid. The site consists of four projects totaling 620 MWDC of solar and 200 MWh of energy storage.

The projects, using single-axis tracking technology, are located adjacent to each other on unincorporated land in Riverside County, California, managed by the Federal Bureau of Land Management (BLM). The BLM designated this area as a Solar Energy Zone (SEZ) and Development Focus Area, land set aside for utility-scale renewable energy development.

Click here to read the full article
Source: Solar Power World

If you have any questions or thoughts about the topic, feel free to contact us here or leave a comment below.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *